01. Introduction
As one of Hardt Electric’s most schedule aggressive and safety driven projects in our history, this photovoltaic project at Argonne National Laboratory has a 93 kW DC nameplate capacity. It’s intended to be a platform for the development and study of future photovoltaic system technologies.


02. Results
The system covered three different PV module manufacturers incorporating both monocrystal and thin film technologies. The project was installed in less than 2 ½ weeks.
Argonne National Laboratory
9700 South Cass Avenue Suite B109, Lemont, Illinois