Our team worked on the conference and board rooms, including installing multiple interpreter booths in each location. We installed multiple systems, including installing a new fire alarm system for the building, a new boiler plant and a new chiller plant. We also installed a generator, UPS (uninterruptible power supplies) and the batteries associated with them. In addition, we worked the new cafeteria and several tenant build-outs, including restacking and rewiring furniture, along with handling ongoing maintenance of the outlets.